PestCom offers pre- construction anti- termite treatment in the
following three stages:

We treat the sides and bottom surface of the foundation trenches and pits with chemical to a height of about 30cm at the
rate of 5 Lit. per square meter of surface area.

Backfill earth on each side of all built up walls, which will be in immediate contact with the foundation, should be treated with
chemical at the rate of 7.5Lit. per linear meter of vertical surface of the substructure, to a depth of 45cm and width of 15cm.
The chemical shall be directed towards the masonry surfaces so that earth in contact with these surfaces is well treated with
the chemical.

Before laying the floor, treat the top surface of the consolidated earth within the plinth walls with chemical at the rate of 5lit.
Per square meter. Ensure back fill against foundation is treated to its full depth. Builders should take care that any disruption
of the barrier during later construction work (e.g. creation of gardens over the treated barrier), may lead to untreated gaps.